January 14 Team B Build Shift (6-9)

View previous topic View next topic Go down

January 14 Team B Build Shift (6-9)

Post  Max Yan on Thu Jan 14, 2016 10:57 pm

Completed:

-Got prototype of shooter (motor and wheels) attached and functioning
-Dismantled Drive base,  currently modifying in progress
-Pneumatic wheels tapped
*Jig for churros is in first teacher's cabinet on top shelf*

To do:
-Mount Shooter to Lexan
-Lexan scoop (cut part got burnt off)
-Finish modifying drive base to accommodate pneumatic wheels
-Mount Pneumatic wheels to above mentioned drive base
-Mount Lexan Side guides
Gear box mounting plate for rear-wheel drive (preferably milled)

Also, if anyone would like to come out on Saturday from 9-2 for the UOIT Lego League with a robot and other parts ONLY TEAMS A-C, F

NOTICE:  TEAM MEMBERS ON E (1-5) SHOULD BE ON STANDBY TO COME TO MORNING SHIFT INSTEAD OF SCHEDULED DUE TO LACK OF SUPERVISION


Last edited by max yan on Fri Jan 15, 2016 7:24 pm; edited 1 time in total

Max Yan

Posts : 29
Join date : 2014-10-16
Age : 17

Back to top Go down

Re: January 14 Team B Build Shift (6-9)

Post  chefjohn on Thu Jan 14, 2016 11:59 pm

Drivebase will now be chain driven. Also pneumatic wheels have all been removed from fribee robot and tappes 1/4 20. But we can not use the belt drive hubs they will not sink with wheels. So moving forward no more work on shooter or in take prior to a drive base being completed.

_________________
-John MacKinnon Dip.Tech.ED, OCT
Culinary Arts, Robotics 
Sinclair Secondary School, DDSB
Work# Tel: 905-666-5500 ext 5626
Fax: 905-666-6902
Website: http://www.sinclairsecondaryschool.com/
Email Work john.mackinnon@ddsb.ca
Email Home chefjohn@rogers.com
Home# 905-493-1226
Cell#  After 3pm , text , call anywhere in Canada,
289-923-1275
avatar
chefjohn
Admin

Posts : 158
Join date : 2012-06-19

Back to top Go down

Re: January 14 Team B Build Shift (6-9)

Post  Kelly McCarthy on Fri Jan 15, 2016 5:23 pm

Saturday shifts will go ahead as previously planned.  Team D 9-1 and team E 1-5.

Kelly McCarthy

Posts : 7
Join date : 2012-02-05

Back to top Go down

Re: January 14 Team B Build Shift (6-9)

Post  Sponsored content


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum