1 - 5 shift. Jan 16 Team E

View previous topic View next topic Go down

1 - 5 shift. Jan 16 Team E

Post  William Campbell on Sat Jan 16, 2016 8:12 pm

- Electronics panel was mounted
-pickup wheel, ends are marked for cutting
-correct shaft was put in pickup wheel
-metal for Sam's shooter were are cut
>diagram indicates build instructions
>rest of holes need to be drilled in pieces
>find bolts to assemble device
-Need to temporarily mount pickup wheel to front of robot (use clamps or something similar, don't drill and bolt)


William Campbell

Posts : 10
Join date : 2013-09-26

Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum