1 - 5 shift. Jan 16 Team E
Page 1 of 1
1 - 5 shift. Jan 16 Team E
- Electronics panel was mounted
-pickup wheel, ends are marked for cutting
-correct shaft was put in pickup wheel
-metal for Sam's shooter were are cut
>diagram indicates build instructions
>rest of holes need to be drilled in pieces
>find bolts to assemble device
-Need to temporarily mount pickup wheel to front of robot (use clamps or something similar, don't drill and bolt)
-pickup wheel, ends are marked for cutting
-correct shaft was put in pickup wheel
-metal for Sam's shooter were are cut
>diagram indicates build instructions
>rest of holes need to be drilled in pieces
>find bolts to assemble device
-Need to temporarily mount pickup wheel to front of robot (use clamps or something similar, don't drill and bolt)
William Campbell- Posts : 10
Join date : 2013-09-26
Similar topics
» Team A Build Shift January 24 (9-1)
» Team E Build Shift January 19 (6-9)
» January 14 Team B Build Shift (6-9)
» Team A Build Shift January 17 (1-5)
» Team D Build Shift Januray 19th 3-6
» Team E Build Shift January 19 (6-9)
» January 14 Team B Build Shift (6-9)
» Team A Build Shift January 17 (1-5)
» Team D Build Shift Januray 19th 3-6
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|