Sinclair Sprockets
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Team C 21/01/2016 6-9

Go down

Team C 21/01/2016 6-9 Empty Team C 21/01/2016 6-9

Post  Muhammad Aayan Fri Jan 22, 2016 1:22 pm

Done
• Talons zip tied on
• Motor connected to power distributor board
• Fixed/organized all the wiring
• Support for shooter replaced with c channel
To be done
• Add hinges on the plate for electrical board
• Hook up electrical on computer
• Continue wiring shooter
• Create worm drive on single motor
• Adjust front roller wheel to be inside perimeter of robot

**REFER ALL WIRING DONE TO THE DIAGRAMS CONTAINED WITHIN BLUE 2016 KICKOFF PACKAGE**

Muhammad Aayan

Posts : 10
Join date : 2013-10-03
Age : 25

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum