The shift was ended early
- Bearing blocks have holes now and have been cut on some edges to fit into the frame with other parts such as the motor and other bolts
- Made holes on electrical lexan for the router
- Router + Voltage Regulator have been mounted
- Attached the rectangular rod to the bent lexan
To Do
- Mount bearing blocks to the frame(some bolts are already in place)
- Mount the bent lexan piece
- Work on shooter designs