Team F January 23 1-3:30

Go down

Team F January 23 1-3:30 Empty Team F January 23 1-3:30

Post  Ayman Shaikh Sat Jan 23, 2016 8:29 pm

Done

  • Bearing blocks have holes now and have been cut on some edges to fit into the frame with other parts such as the motor and other bolts
  • Made holes on electrical lexan for the router
  • Router + Voltage Regulator have been mounted
  • Attached the rectangular rod to the bent lexan


To Do

  • Mount bearing blocks to the frame(some bolts are already in place)
  • Mount the bent lexan piece
  • Work on shooter designs


The shift was ended early