Team D Friday January 22
Done :
Hinges
Shooter worked on
Bearings in place
Electrical pretty much done
To do:
Finish shooter
Find new hinges (current ones are really bad)
Hinges
Shooter worked on
Bearings in place
Electrical pretty much done
To do:
Finish shooter
Find new hinges (current ones are really bad)
Bazsi Kadas- Posts : 21
Join date : 2013-09-25
Age : 24
I find Lack of detail troubling
I have really no idea what was achieved in 4 hours? I have no idea what the next steps are based on the notes that were left. I spent 25to30 minutes with this team explaining what needed to be completed by the end of the shift. I want to see all persons whom were in on this shift on Monday at lunch so I can get a better understanding what happen and where we can improve for the future.
aurora- Posts : 8
Join date : 2013-09-25
Age : 24
Re: Team D Friday January 22
To clear any confusion:
What was done:
- cRIo was mounted, and the piece of lexan with victors on it was put on hinges to be able to fit and allow for battery removal
- Fixed chain for shooter A (hopefully)
- Holes for bearings on Sam's shooter were milled (shaft with wheel will be put through)
- Curved piece of shooter was partially re-made, and assembled
- Shooter pieces were assembled, now only missing top pieces to help stability and prevent moving
- Said pieces can be found along with the shooter in the black tote at the back of the class
Need to do:
- If a coder is there, attach PWM cables to cRIO and try to get drive base running
- Work on shooter B: Drill holes for bearings on opposing ends from previous holes, and find sprockets and chain for miniCIM and wheels to allow it to be chain driven
What was done:
- cRIo was mounted, and the piece of lexan with victors on it was put on hinges to be able to fit and allow for battery removal
- Fixed chain for shooter A (hopefully)
- Holes for bearings on Sam's shooter were milled (shaft with wheel will be put through)
- Curved piece of shooter was partially re-made, and assembled
- Shooter pieces were assembled, now only missing top pieces to help stability and prevent moving
- Said pieces can be found along with the shooter in the black tote at the back of the class
Need to do:
- If a coder is there, attach PWM cables to cRIO and try to get drive base running
- Work on shooter B: Drill holes for bearings on opposing ends from previous holes, and find sprockets and chain for miniCIM and wheels to allow it to be chain driven
Ben Hu- Posts : 42
Join date : 2013-10-03
Age : 24
Similar topics
» Team E Friday 29
» Team F Friday Feb 5 (3-7)
» January 27 Team B (6-9)
» Team E January 23 9-1
» Team F January 23 1-3:30
» Team F Friday Feb 5 (3-7)
» January 27 Team B (6-9)
» Team E January 23 9-1
» Team F January 23 1-3:30
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|