Sinclair Sprockets
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Team B (1-5) January 24

Go down

Team B (1-5) January 24 Empty Team B (1-5) January 24

Post  Max Yan Sun Jan 24, 2016 6:03 pm

Completed:

-Mounted the Lexan electrical plate to the hinges
-Mounted VRM
Drive Base is working, Sam needs to adjust code for Driving
-Mounted bar for Sam's Shooter
-Readjusted Drive base (Bearing had popped out, bolts loose)
To Do
-Continue Mr. Mackinnon's shooter (Ask Mr. Mackinnon for further reference as there is no drawing)
-Continue pickup (Also ask Mr. Mackinnon)
-Drill bearing block mount holes in frame

Max Yan

Posts : 29
Join date : 2014-10-16
Age : 23

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum