Team B (1-5) January 24
Page 1 of 1
Team B (1-5) January 24
Completed:
-Mounted the Lexan electrical plate to the hinges
-Mounted VRM
Drive Base is working, Sam needs to adjust code for Driving
-Mounted bar for Sam's Shooter
-Readjusted Drive base (Bearing had popped out, bolts loose)
To Do
-Continue Mr. Mackinnon's shooter (Ask Mr. Mackinnon for further reference as there is no drawing)
-Continue pickup (Also ask Mr. Mackinnon)
-Drill bearing block mount holes in frame
-Mounted the Lexan electrical plate to the hinges
-Mounted VRM
Drive Base is working, Sam needs to adjust code for Driving
-Mounted bar for Sam's Shooter
-Readjusted Drive base (Bearing had popped out, bolts loose)
To Do
-Continue Mr. Mackinnon's shooter (Ask Mr. Mackinnon for further reference as there is no drawing)
-Continue pickup (Also ask Mr. Mackinnon)
-Drill bearing block mount holes in frame
Max Yan- Posts : 29
Join date : 2014-10-16
Age : 23
Similar topics
» Team A January 27 (3-6)
» January 27 Team B (6-9)
» Team E January 23 9-1
» Team F January 23 1-3:30
» Team D January 25th 6-9
» January 27 Team B (6-9)
» Team E January 23 9-1
» Team F January 23 1-3:30
» Team D January 25th 6-9
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|