team c 25/01/16 3-6
Page 1 of 1
team c 25/01/16 3-6
Done
• Drilled and attached intake arms
• Attached Lexan rollers
• Shortened chains and reattached motor
• Worked on Mackinnons design
• Added floater to chain
TO DO
• Finish Mackinions design
• Mount bearings for shooters
• IF needed remove gear box from intake DC motor
\
• Drilled and attached intake arms
• Attached Lexan rollers
• Shortened chains and reattached motor
• Worked on Mackinnons design
• Added floater to chain
TO DO
• Finish Mackinions design
• Mount bearings for shooters
• IF needed remove gear box from intake DC motor
\
Muhammad Aayan- Posts : 10