02/102016 team C 3-6
Page 1 of 1
02/102016 team C 3-6
done
• A new victor was attached on drivebase A
• More fuses added to power distribution board
• metal pieces were added to shooter A to stop it from shifting left to right
To be done
• Attach metal pieces to metal plate for shooter A to stop it from shifting left to right
• check and make sure all victors are working on Drive base A
• work on wiring electrical on shooter b
• A new victor was attached on drivebase A
• More fuses added to power distribution board
• metal pieces were added to shooter A to stop it from shifting left to right
To be done
• Attach metal pieces to metal plate for shooter A to stop it from shifting left to right
• check and make sure all victors are working on Drive base A
• work on wiring electrical on shooter b
Muhammad Aayan- Posts : 10
Join date : 2013-10-03
Age : 25
Similar topics
» Feb 3 Team B (3-6)
» Feb 8th 6-9 - team f
» Team D Feb 14 9-1
» Team C 01/28/16 3-6
» Team A feb 18 6-9
» Feb 8th 6-9 - team f
» Team D Feb 14 9-1
» Team C 01/28/16 3-6
» Team A feb 18 6-9
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|