Done
-Mounted them
-Soldered the pole connectors for Power Distribution Board
To Do
- Wired speed controllers for window and shooter motors on design A
-Mounted them
-Soldered the pole connectors for Power Distribution Board
- Mounted PDB on design A
- The lexan on hinges has been cut to fit the battery on design A
- Labeled the wiring on design B
- Finished kick piece on design B
- Finished bending and mounting cam piece on design B
To Do
- The rest of the speed controllers are to be mounted on the lexan with hinges and wired
- The pole connectors going into the PDB have to soldered and secured with heat shrink tape (look at other wires in the PDB as an example)
Ayman Shaikh- Posts : 18
Join date : 2013-09-26
Age : 24
Similar topics
» Team E (6-9) thurs. Feb 11
» Team A feb 18 6-9
» Feb 3 Team B (3-6)
» Feb 8th 6-9 - team f
» Team D Feb 14 9-1
» Team A feb 18 6-9
» Feb 3 Team B (3-6)
» Feb 8th 6-9 - team f
» Team D Feb 14 9-1
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|