Team E (6-9) thurs. Feb 11
Done:
-overhaul on electronics for drive base A begun
-Ball stabalizer mounted on shooter B
-Battery mount for A assembled
To be done:
-Mount power distribution board on drive A
-make connections from PDB to speed controllers with appropriate
length wires on drive A
-mount all speed controllers (victors) on drive A