Team E Build Shift January 19 (6-9)
Page 1 of 1
Team E Build Shift January 19 (6-9)
What got done:
- Finished with mounting all electronic components - talons may need to be moved to 3 inches away from drive sides
- Made lexan pieces for bottom of robot, between the wheels (4.5" x 2" and 3" x 2")
- Made curved portion of shooter, rough assembled (see attached picture) and soldered miniCIM
Need to do:
- Bearing holes on shooter need to be milled (marked already)
- Shooter assembly after milling and bearings
- Find chain and sprockets to drive both wheels from MiniCIM
- Finish other pair of lexan undersides
- Finished with mounting all electronic components - talons may need to be moved to 3 inches away from drive sides
- Made lexan pieces for bottom of robot, between the wheels (4.5" x 2" and 3" x 2")
- Made curved portion of shooter, rough assembled (see attached picture) and soldered miniCIM
Need to do:
- Bearing holes on shooter need to be milled (marked already)
- Shooter assembly after milling and bearings
- Find chain and sprockets to drive both wheels from MiniCIM
- Finish other pair of lexan undersides
Ben Hu- Posts : 42
Join date : 2013-10-03
Age : 24
Similar topics
» January 14 Team B Build Shift (6-9)
» Team A Build Shift January 24 (9-1)
» Team A Build Shift January 17 (1-5)
» Team D Build Shift Januray 19th 3-6
» 9-1 shift on January 16th log
» Team A Build Shift January 24 (9-1)
» Team A Build Shift January 17 (1-5)
» Team D Build Shift Januray 19th 3-6
» 9-1 shift on January 16th log
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|