Team B Saturday-1-5
Page 1 of 1
Team B Saturday-1-5
Done:
-drive base A completed and squared
-mounting holes for shooter B completed
-shooter B shaft assembly completed
Need to Do:
- Pivot holes for shooter B need to be drilled
-sprockets, motors, and wheels need to be assembled on shooter B for chain on drive shafts of the shooter
-drive base A completed and squared
-mounting holes for shooter B completed
-shooter B shaft assembly completed
Need to Do:
- Pivot holes for shooter B need to be drilled
-sprockets, motors, and wheels need to be assembled on shooter B for chain on drive shafts of the shooter
William Campbell- Posts : 10
Join date : 2013-09-26