Hey all, here's what we finished:
-attached mount for shooter A
-attached pivots for shooter A
-mounted lexand and bar to drivebase B
-mounted pivots for shooter B and attached it.
-tested functionality for shooter B with strings and pulley.
What needs some work:
-Finish shooter B and get window motor attached.
-redo all of the electrical on shooter A
- mount CIM for pickup on design A
- attach talons to drivebase B
-attached mount for shooter A
-attached pivots for shooter A
-mounted lexand and bar to drivebase B
-mounted pivots for shooter B and attached it.
-tested functionality for shooter B with strings and pulley.
What needs some work:
-Finish shooter B and get window motor attached.
-redo all of the electrical on shooter A
- mount CIM for pickup on design A
- attach talons to drivebase B
Bazsi Kadas- Posts : 21
Join date : 2013-09-25
Age : 24
Similar topics
» team 254 so troll LOL
» Programming progress 2013
» Feb 3 Team B (3-6)
» team c 25/01/16 3-6
» Feb 8th 6-9 - team f
» Programming progress 2013
» Feb 3 Team B (3-6)
» team c 25/01/16 3-6
» Feb 8th 6-9 - team f
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|