01/31/2016 Team C 1-5
Page 1 of 1
01/31/2016 Team C 1-5
Done
• Added support for shooter A
• Added flatter wheels to drive base A(It can now go over all obstacles!!)
• Shooter A pivot shaft finished
To be Done
• Redesign and Rebuild Shooter B(Talk to William Campbell )
• Secure all electronics for drive base A
• Bolt the last support on shooter A(support channel/holes already made)
• Added support for shooter A
• Added flatter wheels to drive base A(It can now go over all obstacles!!)
• Shooter A pivot shaft finished
To be Done
• Redesign and Rebuild Shooter B(Talk to William Campbell )
• Secure all electronics for drive base A
• Bolt the last support on shooter A(support channel/holes already made)
Muhammad Aayan- Posts : 10
Join date : 2013-10-03
Age : 25
Similar topics
» Team A (3-6) Feb 23, 2016
» Team E 2016/02/04
» Feb 10, 2016 Team D 6-9
» Feb. 7, 2016 - (9-1) - Team C
» Team C 21/01/2016 6-9
» Team E 2016/02/04
» Feb 10, 2016 Team D 6-9
» Feb. 7, 2016 - (9-1) - Team C
» Team C 21/01/2016 6-9
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|