Re: Ground Pickup
Well now we have confirmation that belts work with frisbees, even with belts only on the bottom. Currently inventor-ing a proto.
Sam Hassall- Posts : 134
Join date : 2012-09-25
Re: Ground Pickup
im not so sure that piece of plastic would work
itd get pushed against the fibres of the carpet whenever we'd move for a pickup, and the robot will doing with more force over a longer distance than a persons hand
itd get pushed against the fibres of the carpet whenever we'd move for a pickup, and the robot will doing with more force over a longer distance than a persons hand
Adnaan Peshimam- Posts : 81
Join date : 2011-10-12
Age : 27
Re: Ground Pickup
I I didn't like the dustpan-style leading edge either. too much room for error. Like will suggested, two small wheels to kick the frisbee up into the conveyors, located just off the ground, but far enough that they don't touch the ground, until the leading-edge design would need to.
Sam Hassall- Posts : 134
Join date : 2012-09-25
Dust pan pickup over rolls
With two rolls on the side you have to be very exact as to hitting the friz
If you have a dust pan style you could have a wide dustpan with a sponge style roll in front a funnel on sides like out 2012 bot that feeds belts
If you have a dust pan style you could have a wide dustpan with a sponge style roll in front a funnel on sides like out 2012 bot that feeds belts
David Smith- Posts : 145
Join date : 2010-10-13
Yes step it up but lets not close the doors
We actually have not discussed anything that challenging yet to build.
Design yes build no.
We also have more then 8 weeks to build.
We can make parts after the build period that could be added at the compitition.
3 competitions is a lot of test time to get it right.
At this time we are in the design stage.
Lets keep all options open and see what we come up with in the next 5 days and then decide what can be done and then decide how to proceed.
Design yes build no.
We also have more then 8 weeks to build.
We can make parts after the build period that could be added at the compitition.
3 competitions is a lot of test time to get it right.
At this time we are in the design stage.
Lets keep all options open and see what we come up with in the next 5 days and then decide what can be done and then decide how to proceed.
David Smith- Posts : 145
Join date : 2010-10-13
great job will ,
Great job will, the second video falls into an idea i am working on for pickup, angel and I actual thought about this in the past weekend protype days, \
thanks again
thanks again
chefjohn- Admin
- Posts : 158
Join date : 2012-06-19
Similar topics
» Why we need ground pickup
» Floor Pickup
» tread needed for pickup
» Back Roll Pick Up
» Some drawings for the tote pickup
» Floor Pickup
» tread needed for pickup
» Back Roll Pick Up
» Some drawings for the tote pickup
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|