We decided to focus on finishing shooter A while the design and some pieces for shooter B were worked on elsewhere;
What got done:
- Angle iron piece cut for going across the drive base
- Cam motor mounted to a piece, which now needs to be mounted to some angle iron (between flat stock and previously mentioned angle iron)
- New hex roller worked on, will have less compression than previous roller, needs to be lathed down for bearings now
- Pieces for B and A were milled
- Bracket mounted to pivoting part of shooter A
- Riveted tread onto wheels
What needs to be done:
- Finish mounting angle iron on the base, and for the window motor
- Finish riveting tread onto wheels
- Lathe down hex shaft (roller)
- Figure out positioning for motor, pivot, pickup for A
What got done:
- Angle iron piece cut for going across the drive base
- Cam motor mounted to a piece, which now needs to be mounted to some angle iron (between flat stock and previously mentioned angle iron)
- New hex roller worked on, will have less compression than previous roller, needs to be lathed down for bearings now
- Pieces for B and A were milled
- Bracket mounted to pivoting part of shooter A
- Riveted tread onto wheels
What needs to be done:
- Finish mounting angle iron on the base, and for the window motor
- Finish riveting tread onto wheels
- Lathe down hex shaft (roller)
- Figure out positioning for motor, pivot, pickup for A
Ben Hu- Posts : 42
Join date : 2013-10-03
Age : 24
Similar topics
» Team A February 22 (3-6)
» February 4 Team D (3-6)
» Team A February 12 (1:30-5:30)
» Team A February 15 (1-5)
» February 16 Team B (3-6)
» February 4 Team D (3-6)
» Team A February 12 (1:30-5:30)
» Team A February 15 (1-5)
» February 16 Team B (3-6)
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|