What needs to happen for January 14
Page 1 of 1 • Share •
What needs to happen for January 14
1. Get a gear box mounting plate for rear wheel drive.
2. Get the lexan scoop made
3. Make the 2 wheel roller intake
4. Mount the shooter to the lexan
5. Mount the lexan side guides
6. Mount pneumatic wheels to drive base
2. Get the lexan scoop made
3. Make the 2 wheel roller intake
4. Mount the shooter to the lexan
5. Mount the lexan side guides
6. Mount pneumatic wheels to drive base
Riley McCarthy-Robertson- Posts : 49
Join date : 2011-11-19
Age : 20

» The 2nd january 2011 missile attack!
» I Never Thought This Would Happen To Me
» Sunday, January 1, 2012 17:59 Jaafari, calls for armed factions to lay down arms and participate in building Iraq
» While Iraq is being partitioned 02 January 2012, Monday
» Banking Technology Summit 22 - 25 January, 2012, Sheraton Amman Al Nabil Hotel & Towers, Amman, Jordan
» I Never Thought This Would Happen To Me
» Sunday, January 1, 2012 17:59 Jaafari, calls for armed factions to lay down arms and participate in building Iraq
» While Iraq is being partitioned 02 January 2012, Monday
» Banking Technology Summit 22 - 25 January, 2012, Sheraton Amman Al Nabil Hotel & Towers, Amman, Jordan
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum