Sinclair Sprockets
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Team E January 23 9-1

Go down

Team E January 23 9-1 Empty Team E January 23 9-1

Post  aurora Sat Jan 23, 2016 5:00 pm

I took Sarnti's shift
Hamza took Carol's shift
Murtaza took Beyonce's shift


Done:
Bearing blocks were milled
shooter wheel/shaft was cut on lathe
lexan was cut

To Do:
attach bearing blocks (drill holes corresponding to drive base hole)
lexan sheet needs to be attached
fix electrical (change bolts on the hinges so it closes properly)

Smile


aurora

Posts : 8
Join date : 2013-09-25
Age : 24

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum