Team E January 23 9-1
Page 1 of 1
Team E January 23 9-1
I took Sarnti's shift
Hamza took Carol's shift
Murtaza took Beyonce's shift
Done:
Bearing blocks were milled
shooter wheel/shaft was cut on lathe
lexan was cut
To Do:
attach bearing blocks (drill holes corresponding to drive base hole)
lexan sheet needs to be attached
fix electrical (change bolts on the hinges so it closes properly)
Hamza took Carol's shift
Murtaza took Beyonce's shift
Done:
Bearing blocks were milled
shooter wheel/shaft was cut on lathe
lexan was cut
To Do:
attach bearing blocks (drill holes corresponding to drive base hole)
lexan sheet needs to be attached
fix electrical (change bolts on the hinges so it closes properly)
aurora- Posts : 8
Join date : 2013-09-25
Age : 24
Similar topics
» Team B (1-5) January 24
» Team A January 27 (3-6)
» January 27 Team B (6-9)
» Team F January 23 1-3:30
» Team D January 25th 6-9
» Team A January 27 (3-6)
» January 27 Team B (6-9)
» Team F January 23 1-3:30
» Team D January 25th 6-9
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|