Post  aurora on Sat Jan 23, 2016 5:00 pm

I took Sarnti's shift
Hamza took Carol's shift
Murtaza took Beyonce's shift


Done:
Bearing blocks were milled
shooter wheel/shaft was cut on lathe
lexan was cut

To Do:
attach bearing blocks (drill holes corresponding to drive base hole)
lexan sheet needs to be attached
fix electrical (change bolts on the hinges so it closes properly)

Smile