Team A January 27 (3-6)
Page 1 of 1
Team A January 27 (3-6)
What got done:
- How we will continue to work on both designs:
- Design A will continue to use the current base
- Design B will have a new rough base fitted out with the correct dimensions, to figure out dimensions, etc
- We will now be using 8" plaction wheels and a 6" front wheel
- Electrical for shooter A was mostly finished
- MiniCIMs for B were recieved, began mounting
Need to do:
- Switch CIMs in B with MiniCIMS
- Put CIMs back into drive base, make rough base for shooter B
- Mount miniCIM onto shooter A pickup
- Ask Mr. MacKinnon about shooter A for specifics on how to adjust height, intake, etc
- How we will continue to work on both designs:
- Design A will continue to use the current base
- Design B will have a new rough base fitted out with the correct dimensions, to figure out dimensions, etc
- We will now be using 8" plaction wheels and a 6" front wheel
- Electrical for shooter A was mostly finished
- MiniCIMs for B were recieved, began mounting
Need to do:
- Switch CIMs in B with MiniCIMS
- Put CIMs back into drive base, make rough base for shooter B
- Mount miniCIM onto shooter A pickup
- Ask Mr. MacKinnon about shooter A for specifics on how to adjust height, intake, etc
Ben Hu- Posts : 42
Join date : 2013-10-03
Age : 24
Similar topics
» Team E January 23 9-1
» Team F January 23 1-3:30
» Team B (1-5) January 24
» January 27 Team B (6-9)
» Team D January 28th 6-9
» Team F January 23 1-3:30
» Team B (1-5) January 24
» January 27 Team B (6-9)
» Team D January 28th 6-9
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|